How much crew time can you book when only two rooms are ready?
Confirm crew time for partially released rooms by reconciling labour-hours, access times, waiting and the actual visit schedule.
Two installers are booked for four hours. Each of the two released rooms needs three labour-hours. A third room remains closed. Six of the eight labour-hours have confirmed work. If both installers can share the tasks continuously, the spare capacity is one clock hour for the pair. Travel or a one-person task can change that calculation.
Ask the site lead for an access contact and time for each room. Record whether the final hour will be reassigned or removed from the booking before the crew leaves for site.
Planning a return site visit: check readiness before confirming the appointment
Ask when each door opens
The site contact can let the crew into A at 8 am. The keyholder for B arrives at 10 am. Room C is still being used by another trade. Record the contact, earliest start and permitted task against each room. “The floor is ready” leaves all three details uncertain. If an area still requires a separate safety clearance, follow the site's established clearance process before scheduling work there.
Timing can change the result even when the scope stays fixed. If both installers can work side by side in A, three labour-hours take one and a half clock hours. They finish at 9:30. B opens at 10. Without another task the half-hour wait uses one labour-hour. That leaves only one of the two spare labour-hours identified in the initial calculation. The productive work in the two rooms still totals six labour-hours.
Choose what to do with the gap
A preparation task downstairs may fit. Check the time to move tools, whether the materials have arrived and how many people can perform the task. A thirty-minute job for one person uses half a labour-hour. It cannot keep both installers productive for the whole interval. A move to a different site is worthwhile only if travel, unloading and the next start also fit the booking.
The site lead could instead ask the keyholder to open B earlier. When a time changes, update the room entry and tell the crew who will be there. If the key cannot arrive before noon, compare splitting the visit with leaving the installers waiting. Record who will account for the second journey and setup time before promising a shorter visit to the customer.
Give the crew a rereadable booking
The morning instruction can be concise: room A from 8, room B from 10, room C awaiting confirmation. Include the contact number through the usual site channel, the last time the booking can change and the task assigned in each room. Keep actual waiting time separate from hours worked when the crew returns. The planner can then explain why six labour-hours of completed work required more than three elapsed hours on site.
Check the clock-time plan before confirming the booking
Write a short timeline. In this example both installers work in A from 8 to 9:30. B opens at 10 and needs another hour and a half with both people. Confirmed productive work therefore ends at 11:30. The wait from 9:30 to 10 consumes one labour-hour: half an hour for each installer. The period from 11:30 to noon represents another labour-hour. Six productive hours plus those two remaining hours reconcile to the eight booked labour-hours.
This calculation assumes that both people can work together and that tools and materials are already ready. A three-hour task that only one person can perform cannot simply be divided by two. Establish the task sequence before adding up available capacity. Place movement and preparation in the timeline explicitly; they can consume the apparent gap.
For each room record the task, required people, estimated labour-hours, earliest start, access confirmation and person deciding on postponement. Releasing B must not overwrite C’s blocked status. At the end of the visit, reconcile completed tasks to actual time and identify waiting separately. If C is released later, make another scheduling decision. Its new availability does not prove that its work still fits the original four-hour appointment. Ask the crew to read back the room sequence before departure so that the planner’s assumptions become visible.
Check the departure note against the timeline
- 08:00–09:30 — Both installers: Room A; Labour-hours: 3.
- 09:30–10:00 — Both installers: Waiting unless another task is confirmed; Labour-hours: 1.
- 10:00–11:30 — Both installers: Room B; Labour-hours: 3.
- 11:30–12:00 — Both installers: Reassign or shorten the booking; Labour-hours: 1.
The total of eight is labour-hours, not eight elapsed hours. Room C still requires its own confirmation.
Take the timeline to an Enfin demonstration. Reopen the booking and check assigned people, duration and work instructions. Confirm each room separately; this worked example does not establish automatic capacity calculation.
Book a shared unloading bay and crane for two site deliveries
Build a delivery slot from arrival to release of the bay. A worked Belgian site schedule shows how to move the second truck after a delay.
Update a planning assignment with Alfie after checking the site time window
Compare worker, crew, task, dates and site dependencies before confirming a planning-assignment change that affects delivery.
Check In and Out at Work in 2027: site threshold and ready-mix concrete scope
Map the EUR 500,000 site threshold, property-work scope and ready-mix concrete deliveries before Belgium's 2027 attendance change.